Project Details

The Government of Uganda through NWSC constructed the water treatment plant in Katosi, Mukono district. The 240million litres per day water production plant serves over 7.5million people in Kampala, Wakiso and Mukono up to 2040.

Katosi water transmission network at a glance

From the plant, water shall be pumped to the new Nsumba reservoirs (40million litres capacity) through a 9.5km bulk DN1400mm pipeline.

  • The water shall thereafter gravitate to Kampala via Mukono – Seeta – Sonde – Namugongo, through a 55km DN1400mm bulk pipeline.
  • The Project also entails construction of a 15million litre reservoir in Sonde and booster station in Namugongo.

The project also has a component to supply water to Katosi, Lugazi town and the surrounding areas.

Apex Piping Systems

Apex Piping Systems is at the forefront of plumbing innovations, introducing a series of new plastic and piping solutions to the Kenyan market including round pipes, wall plugs, toilet seat covers, garden hose pipes, ferrules, and tubings.

Certification

Contact Us

Funzi Road off Enterprise Road
Industrial Area, Nairobi, Kenya

Opening Hours:

Mon – Fri: 7:00 am – 4:00 pm

Sat 7:00 am – 12:00 pm

Copyright © 2021 Apex Piping Systems Ltd. All Rights Reserved.